ID.3: Power consumption combined: 16.2-15.1 kWh/100 km; CO₂-emissions combined: 0 g/km; CO₂-class: A. Information on consumption, CO₂-emissions and CO₂-classes, shown in ranges, depends on the selected vehicle equipment.
At Dresden's public loading park at the Transparent Factory - open 24/7 for you!
ID.3: Power consumption combined: 16.2-15.1 kWh/100 km; CO₂-emissions combined: 0 g/km; CO₂-class: A. Information on consumption, CO₂-emissions and CO₂-classes, shown in ranges, depends on the selected vehicle equipment.
Drivers of e-models have 36 publicly accessible charging points at the Transparent Factory. The charging points are five each AC and DC charging points with 22 kW and 22 AC charging points with 11 kW. There are also two DC fast chargers with 100 kW at the e-mobility station of the Manufacture. Some of the charging points are protected by a carport modelled on the architecture of the Transparent Factory. They are located in the visitors' car park. Parking is of course free of charge during the charging process. When you leave the car park, you will receive a chip from the Transparent Factory or the barrier will open automatically at the push of a button.
Charging station operator:
SachsenEnergie AG
Friedrich-List-Platz 2 | 01069 Dresden
Report a fault:
SachsenEnergie AG | Service Line 0800 0320020
Real-time display of the occupancy of our parking lot and e-mobility station
Thanks to a sensor system developed and expanded by the young company Smart City System from Nuremberg during its stay in our start-up incubator, you can see in advance whether the visitor car park currently has free spaces.